42C Penjuru Road · B2 Industrial · 33-Year Lease· District 22, Jurong
Penjuru Connection logo
Artist’s impression, illustrative only: a bright fulfilment floor with a roller conveyor, packing stations and full-height glazing onto greeneryArtist’s impression · Illustrative only, not the development

Penjuru Connection Purchase Calculator

Model the cash needed for a Penjuru Connection unit: the first eight weeks, each construction stage with its GST, the bank’s drawdown and the monthly instalment. The stages follow the payment scheme and the duties follow the stamp duty and GST page.

Penjuru Connection Purchase Calculator

Keep a copy of this estimate as a PDF or on paper.

Purchase details

Results refresh as you type.

Illustrative figure, enter your own price.

The highest ratio is usually reserved for a company occupying its own unit.

Use the rate after any lock-in period as well as the opening one.

These two fields feed only the property tax estimate at the end.

Weeks 0 to 8

Enter the option date to see calendar dates.

    Loan summary

    Based on the ratio chosen.

    Purchase price
    —
    Bank loan
    —
    Your share
    —

    Payments in the first eight weeks

    GST is added to every instalment as it is billed.

    Cash to secure the unit

    Only your own money; amounts the bank pays are left out.

    Cash due within 8 weeksBefore building work starts
    —

    The stages that follow are paid largely by the bank as construction advances; the GST on each of them is paid by you in cash.

    Construction stages and drawdown

    Statutory schedule for new commercial and industrial property. Timings are indicative and follow site progress.

    Swipe sideways to see the full table

    StageTiming%InstalmentGST 9%Your cashLoan drawnLoan %InterestPrincipalRepayment

    Monthly instalment

    After the loan is fully drawn.

    Full monthly instalment
    —

    While building is under way, interest is charged only on the amount drawn, so repayments rise stage by stage (see the last two columns above).

    Property tax estimate

    Starts from TOP; there is no property tax during construction.

    Yearly rent estimate
    —
    Unit area
    —
    Tax a year at 10%
    —

    IRAS levies property tax on industrial units at 10% of annual value, a figure it derives from market rents for similar space; the rent above is only your assumption.

    How the Penjuru Connection Calculator Works

    The calculator opens at an illustrative $1,500,000, which is not a price at Penjuru Connection; enter any figure. It applies the industrial schedule: a fifth of the price within eight weeks, staged instalments as construction advances, a quarter at TOP and the last tenth on completion, each carrying 9% GST.

    The loan-to-value buttons switch between 70%, 80% and 90%, and the comparison view lays the three out together: the bank loan, the cash due up front, any later cash top-up, the GST across the purchase and the monthly repayment. Banks usually treat 80% as the practical ceiling on a unit still under construction, so read the 90% column as a reference and confirm the ratio with your bank.

    Penjuru Connection Calculator Limits

    Valuation fees, bank charges, fit-out and insurance are outside it, and IRAS assesses duty on the higher of price and market value. Rates and bank terms change, so treat every result as an estimate and check it with your bank. The industrial loan page explains the lending rules behind the ratios.

    Indicative only, as at October 2026: confirm with IRAS, MAS and your bank before you commit.

    Registration by email

    Register for Penjuru Connection

    Every document Soilbuild issues for Penjuru Connection goes first to the firms and buyers on the register. Showflat viewings are arranged by appointment through the Sales Concierge; email us to register.

    What registration brings

    The Sales Concierge
    ViewingsShowflat viewings are arranged by appointment through the Sales Concierge; email us to register.
    Address42C Penjuru Road, Singapore 609147
    ZoningBusiness 2 (B2)
    Tenure33 years
    DeveloperSoilbuild Group Holdings Ltd.