42C Penjuru Road · B2 Industrial · 33-Year Lease· District 22, Jurong
Penjuru Connection logo
Artist’s impression, illustrative only: a bright fulfilment floor with a roller conveyor, packing stations and full-height glazing onto greeneryArtist’s impression · Illustrative only, not the development

What Stamp Duties Apply to an Industrial Unit at Penjuru Connection?

A unit at Penjuru Connection attracts Buyer's Stamp Duty on the industrial and commercial scale, which rises in five bands from 1% to 5%, and nothing more on entry: no Additional Buyer's Stamp Duty arises on an industrial purchase. On the way out, Seller's Stamp Duty is charged if an industrial unit is resold within three years of purchase, and falls away after that, as at October 2026.

Buyer's Stamp Duty on a Penjuru Connection Unit

Buyer's Stamp Duty, usually shortened to BSD, is the tax on the document by which you acquire the property. IRAS computes it on the higher of the purchase price and the market value, before GST, and it is payable soon after the Sale and Purchase Agreement is exercised. For industrial and commercial property the scale has been unchanged since 15 February 2023.

The scale is marginal. The first slice of the price is taxed at 1%, the next at 2%, a larger middle slice at 3%, the following slice at 4%, and everything above the top threshold at 5%. Because only the top slice bears the 5% rate, the effective rate on the whole price always sits below 5%. Industrial and commercial property tops out at a 5% band, which is one of the quieter advantages of buying business space.

The exact thresholds for each band, with worked examples, are on the stamp duty and GST page. If you would rather see the figure for a particular price, the stamp duty calculator builds it up band by band and shows the effective rate alongside.

Why No ABSD Arises at Penjuru Connection

No Additional Buyer's Stamp Duty arises on a B2 industrial unit, whatever the buyer's nationality or existing holdings. A Singapore company, a foreign-owned company, an individual or a trust buying space at Penjuru Connection pays the same Buyer's Stamp Duty and no ABSD at all.

The same holds whether the unit is bought outright or through a holding company set up for the purpose, and whether it is intended for owner-occupation or for leasing to a tenant. ABSD simply does not attach to industrial land or buildings.

This matters most to two groups: overseas businesses setting up a production or distribution base in Singapore, and investors building a portfolio of several properties. For both, the entry duty on a unit at Penjuru Connection is Buyer's Stamp Duty alone.

Seller's Stamp Duty and the Penjuru Connection Holding Period

Seller's Stamp Duty, or SSD, is where industrial property differs from commercial property. IRAS levies SSD on industrial buildings and industrial land bought from 12 January 2013 onwards and then sold before three years have passed. The rates are set by how long the property was held:

Holding periodSSD rate on industrial property
Up to one year15%
More than one year, up to two years10%
More than two years, up to three years5%
More than three yearsNone

The duty is worked out on whichever is greater: the sale price or the market value at the time of sale. Source: IRAS, as at October 2026; confirm with IRAS before any sale.

Commercial property, such as strata offices and shops, carries no SSD at all. B2 zoning places Penjuru Connection firmly on the industrial side of that line, so a buyer should treat the first three years as a period in which an early sale has a cost.

IRAS also lists exemptions. One of them covers the sale of industrial units by an industrial property developer that built them in the course of its development business, so the developer's own first sale of each unit at Penjuru Connection does not attract SSD. The holding period for the buyer starts from the buyer's own date of acquisition.

Fitting the Duties into a Penjuru Connection Budget

For most buyers the entry cost is straightforward: BSD on the price, GST on each instalment, and legal fees. BSD is paid in cash and cannot be financed through the property loan in the ordinary course, so it belongs alongside the down payment in the early-stage budget. The purchase calculator places it in the first eight weeks of the purchase, together with the option fee and the balance of the down payment.

SSD is a planning point rather than a cost for anyone intending to occupy or hold the unit for the long term. Where a resale within three years is a possibility, it is worth modelling the exit cost before committing. The industrial loan page covers the financing side, and the payment scheme page shows when each instalment falls due.

All rates here are those published by IRAS as at October 2026. Tax rates are reviewed in Budget statements, so confirm the position with IRAS or a tax adviser at the point of purchase.

Register with the Sales Concierge to receive the price list for Penjuru Connection when the developer releases it, so the duties can be worked out on actual figures.

Email the Sales Concierge