Penjuru Connection is zoned Business 2, so it is planned for general and special industries such as manufacturing, fabrication, engineering, food production and warehousing. The exact use of any unit is still subject to the approved plans for the development and to the requirements of URA, JTC, NEA and any licensing authority for that trade.
This article looks at the families of business that typically choose a B2 address in the Jurong industrial belt, how the 60/40 use rule shapes a unit, and how an operator can check that a particular process will be accepted. Planning rules are stated as at October 2026.
The kinds of trade a B2 address like Penjuru Connection is built for
URA places clean and light industries in Business 1 and reserves Business 2 for general and special industries. In practice, B2 estates attract operations that generate more vehicle movement, noise or process emissions than an office-like light-industry building can comfortably host. Typical examples across Singapore’s B2 districts include:
- Metal fabrication, machining and precision engineering workshops.
- Warehousing, distribution and third-party logistics, often linked to port and cargo flows.
- Food manufacturing, central kitchens and food processing lines.
- Surface treatment work such as coating and finishing, subject to the relevant environmental controls.
- Equipment servicing, repair and assembly for marine, construction and process industries.
Many of these firms share a need for robust floors, generous loading space and the freedom to run machinery or vehicles around the clock without disturbing residents. That combination is hard to find in mixed-use or light-industry buildings, which is why operators in these sectors tend to look first at general-industry estates in the west and north of the island.
The list is illustrative rather than a promise. Some trades fall within B2 but still need specific clearance, and a few special industries may be directed to dedicated estates. The precise position for each unit becomes clear once the developer publishes the approved uses with the sales material.
Why logistics and marine-linked firms look at Penjuru Connection
Location is a large part of the B2 story at Penjuru Road. Jurong Port lies about one kilometre to the west by straight line, and the Jurong Island Checkpoint is roughly 2.3 kilometres away. Firms that move cargo through the port, supply the petrochemical cluster on Jurong Island, or service vessels and offshore equipment tend to prize short truck journeys to those gates.
The surrounding streets of the Penjuru Crescent subzone are already given over to warehouses, yards and workshops, so heavy vehicles and shift work are part of the normal rhythm of the area. The location page sets out the distances, and the amenities page covers food and services for workers nearby, including Teban Gardens Market and Food Centre about 2.3 kilometres away.
How the 60/40 rule shapes a unit at Penjuru Connection
URA’s use quantum guideline for B2 requires that at least 60% of industrial floor space is used for industrial purposes, with no more than 40% for ancillary uses. In a strata-subdivided development the same split applies inside each unit. An operator therefore plans the production floor, storage or workshop first and fits the supporting office, showroom area or meeting room within the ancillary share.
| Type of space in a unit | Counts as |
|---|---|
| Production floor, workshop, storage, packing area | Industrial use (at least 60%) |
| Ancillary office, meeting room, supporting showroom | Ancillary use (up to 40%) |
Simplified reading of URA’s B2 use quantum guideline, as at October 2026. Final classification follows the approved plans and the agencies’ assessment.
A firm that mainly needs office space is better served elsewhere; a firm whose core work is making, storing or servicing things is exactly the occupier a B2 building is designed around.
Checking your own process against Penjuru Connection’s approvals
Before committing to a unit, an operator should confirm three things. First, that the activity is permitted under the development’s approved uses. Second, that any environmental or safety requirements, such as NEA controls on emissions or the handling of hazardous substances, can be met in the unit chosen. Third, that trade-specific licences can be obtained at that address.
Many buyers ask their consultants or the relevant agency to review the process early, and NEA offers an Industrial Siting Consultation route for advice on proposed industrial uses. Once Soilbuild releases the unit schedule, the Sales Concierge can relay a description of your process to the developer so that questions about suitability are handled before you shortlist.
Penjuru Connection details still to come
Soilbuild will set out how many units there are, how many storeys, the loading capacity of each floor, the clear heights and the loading provisions together with the floor plans and the e-brochure; registered buyers receive them first. Those figures decide which floors suit heavier machinery or vehicle access, so they are the next thing to read once released.
In the meantime, the project details page holds the confirmed land-sale facts, and the payment scheme page explains how an industrial purchase is paid for in stages.
Describe your operation in a short email and the Sales Concierge will send the relevant plans as soon as they are issued.
